FIT FOR PURPOSE RIG

RIG DESIGN

This study was performed at  TEMPA ROSSA Field, South Italy.

The main characteristics of the rig are:

  • •  Fit for purpose workover rig
  • •  Designed for Tempa Rossa field
  • • Maintenance and replacement of ESP Pump
  • •  Interfaces with production
  • •  Interfaces with well servicing equipment.

The job was to write a specification for a call for tender for such a rig

key facts