PLATFORM RIG – INDEPENDANT AND MODULAR
RIG DESIGN The FMWR has been designed as a self-erecting, independent platform rig. – Small footprint, 12m x 30m. Its flexibility allows a set-up and
RIG DESIGN The FMWR has been designed as a self-erecting, independent platform rig. – Small footprint, 12m x 30m. Its flexibility allows a set-up and
RIG DESIGN This study was performed for the Kalamkas field, north of the Caspian Sea. Three main principles have been considered. · Concept 1: Drilling
RIG DESIGN This DES has been developed simultaneously with the STAD (Semisubmersible Tender Assisted Drilling) for the Moho-Nord Project, including the drilling of 24 wells
RIG DESIGN Design of a 200mT mast for the Arctic area in compliance with Russian GOST Standards.Due to railroad transport constraints, the packages were limited
RIG DESIGN The objective of the project was to design an integrated jacket platform with drilling and production equipment as well as a 200 beds
RIG DESIGN In order to allow a two-year drilling campaign, a modular lightweight and fast moving platform rig were designed by Dietswell. The system had
RIG DESIGN The TALISMAN SINOPEC’s Modular Unit for Well Plug and Abandonment is an adaptation of the FMWR, a Dietswell designed sefl-erected rig constructed in order to
RIG DESIGN This study was performed at TEMPA ROSSA Field, South Italy. The main characteristics of the rig are: • Fit for purpose workover rig
RIG DESIGN SEDLAR stands for Self Elevating Drilling Land Rig In contrast to conventional drilling rigs, SEDLAR rig uses a hydraulic telescopic mast composed of a
SEMI-SUBMERSIBLE TENDER ASSISTED DRILLING STAD The objective of the project is to design a tender to assist a TLP (Tensioned Leg Platform) for the drilling