DETAILS
Client name: GE Renewable Energy
Project name: St Nazaire Factory/Hub – North Sea / 300 Haliade X
Date: 2023 – ongoing
Description of project, activities & mission
Project operated by 8.2 France & DOLFINES
- Quality control of the turbine manufacturing process
- Status control reporting and closure of non-conformities
- Production schedule monitoring
- Training on logistics port inspections (Abble Seaton Port)
- Control and coordination of technical documentation
- Implementation of quality processes
- Customer meetings.
The Dolfines group has experts providing a continuous presence at the St Nazaire plant – and occasional training at the HUB site.