DETAILS
Client name: EDF Renouvelables
Project name: Le Havre Factory/Hub/Commissioning Manche / 71 Siemens Gamesa
Date: 2023 – 2024
Description of project, activities & mission
Project operated by 8.2 France
- Quality control of the turbine manufacturing process
- Quality control of the blade manufacturing process
- Production schedule monitoring
- Pre-assembly inspection at the port hub
- Processing – Reporting of non-conformities
- Reporting – Meeting
- Offshore installation and commissioning of turbines
8.2 France had 5 experts providing a continuous presence at the Le Havre plant – a port and offshore hub