Energies for the future

OUR PROJECTS – CASE STUDY – Offshore Wind

VINEYARD WIND 1

DETAILS

Client name: GE Renewable Energy
Project name: St Nazaire Factory/Hub – Atlantic Ocean / 62 Haliade X
Date: 2023 – Ongoing

Description of project, activities & mission

Project operated by 8.2 France

  • Quality control of the turbine manufacturing process
  • Status control reporting and closure of non-conformities
  • Production schedule monitoring
  • Training on HUB Port inspections
  • Control and coordination of technical documentation

 

The Dolfines group has experts providing a continuous presence at the St Nazaire plant – and occasional training at the HUB site.